Sunday, July 8, 2018

Week 2 Update

This week I discussed with the team on how the split track portion would be assembled, going into detail on how much screws and how each piece of wood would be fastened onto one or another. I wrote down some notes on how to assemble each part of the track, so it would be easier to refer when actually assembling. I also think that the discussion was important as it is good to think about assembly when finalizing a design.

I also looked up a lot of local vendors who would supply the materials necessary for the track expansion. I searched on Home Depot frequently because they are a local vendor, and the bulk of our materials is lumber.

No comments:

Post a Comment